Electric11 completed a solar and battery installation near Carvers Lane in Attleborough. The project combined a 13.8 kWp solar array with a 7 kW FOX hybrid inverter, approximately 23 kWh of battery storage, and a failover system.

The completed system gives the property a practical way to generate renewable electricity, store surplus power, and maintain access to selected electrical circuits during a grid outage.

Why the Property Needed Electrical Remedial Work

An earlier EICR had identified issues at the property and returned an unsatisfactory result. The next step was therefore to carry out the remedial work listed for the job.

The recorded tasks covered several parts of the electrical installation. Some involved everyday fittings, such as sockets and a bedroom pendant. Others concerned the consumer unit and the connection serving the shed.

This meant the project needed a clear scope across different areas of the home. In addition to replacing the main board, our team worked through the individual fittings listed in the schedule.

If you are arranging an inspection for your own property, our EICR service in Attleborough explains the service and the purpose of the report.

Combining Solar Generation and Battery Storage

The installation was designed as a complete home-energy system rather than a standalone solar array. Electricity generated by the panels can be used within the property, stored in the FOX batteries, or exported when generation exceeds household demand and the batteries have sufficient charge.

Battery storage allows more solar electricity to be retained for use later in the day. This can reduce the amount of electricity imported from the grid during periods when solar output is lower.

What the Project Included

Our team completed the following work:

  • Replaced the existing consumer unit.
  • Replaced the socket on the right-hand side of the bed in the master bedroom.
  • Replaced the master bedroom pendant light fitting.
  • Replaced a double socket in the conservatory.
  • Replaced the bathroom pull cord.
  • Installed an IP-rated fused spur for the shed supply.
  • Clipped the shed supply cable along the fence.

The scope combined work on the main electrical board with targeted replacements around the property. As a result, the project covered both the central consumer unit and several individual fixtures.

The work also extended outside the home. The shed supply connection and cable route formed a separate part of the recorded installation work.

Replacing the Existing Consumer Unit

The consumer unit replacement was a central part of this project. Often called a fuse box, the consumer unit houses the devices that protect the property’s electrical circuits.

The photographs show the original board before replacement. They also show the new unit with its front cover removed and the completed installation with the cover fitted.

These views provide a record of the change. The original board photograph shows the previous arrangement, while the replacement images document the new board and its finished front panel.

The completed consumer unit has labels for the smoke alarm, lighting, sockets and oven or cooker circuits. As a result, users can identify the circuits more easily when looking at the board.

Clear labelling also makes the completed installation easier to understand. Each label connects a protective device with the circuit it serves, rather than leaving users to guess from the position of the switches.

For more information about similar work, read about our consumer unit replacement service in Attleborough.

Replacing the Master Bedroom Socket

In the master bedroom, we replaced the socket on the right-hand side of the bed. This was one of the individual fittings included in the remedial work schedule.

The photograph shows a white double socket on the bedroom wall. It provides a visual record of the replacement fitting within the room.

Alongside the consumer unit work, this task shows the room-by-room nature of the project. The scope included a specific socket replacement in the bedroom, as well as work elsewhere in the property.

The bedroom also received attention to its pendant light fitting. Together, these two tasks addressed the socket and lighting items listed for that room.

Updating the Bedroom Pendant and Bathroom Pull Cord

The lighting-related work covered two separate fittings. We replaced the pendant light fitting in the master bedroom and the pull cord in the bathroom.

The bedroom photograph shows the white pendant fitting above a purple lampshade. It gives a closer view of the finished fitting and its position on the ceiling.

Meanwhile, the bathroom pull-cord replacement formed another part of the scheduled repairs. This added a separate room to the scope of the remedial work.

These smaller tasks were part of the overall project alongside the consumer unit replacement. They demonstrate how the work covered individual fixtures as well as the main board.

Replacing the Conservatory Double Socket

The conservatory work involved replacing a double socket. The supporting photograph shows the white fitting against a brick wall, close to floor level.

This was the second socket replacement listed in the job notes. In addition to the bedroom fitting, our team addressed the specified socket in the conservatory.

The two replacements formed part of a targeted programme of work. The recorded scope focused on identified fittings across the property, together with the new consumer unit and shed supply connection.

As a result, the completed project brought several separate tasks into one set of remedial works. Each replacement contributed to addressing the work recorded for the property.

Completing the Shed Supply Work

The external work included an IP-rated fused spur for the shed supply. The photograph shows the switched fused connection inside a protective enclosure on the brick wall.

We also clipped the supply cable along the fence, as described in the job notes. In addition, the photographs show the cable route beside the property and around a gravel-covered corner.

These images document different parts of the external work. One view shows the connection itself, while the wider photographs show the route of the cable.

The shed supply work extended the project beyond the internal rooms. Alongside the consumer unit, sockets and lighting fittings, it formed part of the overall remedial work schedule.

Attleborough Consumer Unit Upgrade: The Result

Following the remedial works, the job notes record a satisfactory EICR outcome. This is the main documented result of the project.

The completed scope included a replacement consumer unit, two socket replacements, a bedroom pendant fitting, a bathroom pull cord and work on the shed supply.

Together, these tasks addressed the recorded repairs across the property. The project therefore combined a main board replacement with work on individual fittings in several locations.

This Attleborough consumer unit upgrade focused on resolving the issues behind the earlier unsatisfactory report. The completed work and satisfactory EICR outcome provide the central story of the project.

For readers who want to understand electrical inspection findings, Electrical Safety First’s guidance on EICR classification codes provides further background. Its Best Practice Guide 4 explains the codes used to record observations during an inspection.

Discuss Electrical Remedial Work in Attleborough

If your property has an unsatisfactory EICR, the report provides a starting point for discussing the work it identifies. Our team can review the findings and explain the proposed repairs.

You may need work on a consumer unit, individual electrical fittings or several areas of the installation. A clear scope helps you understand which tasks the project will cover.

To discuss an Attleborough consumer unit upgrade or remedial work following an inspection, contact Electric11. We can explain the next steps and help you understand the work your property needs.

Get a Free Quote
Shed supply cable running along the fence beside the property
Black shed supply cable following the fence around a gravel-covered corner
External switched fused spur on a brick wall with its protective lid open
New consumer unit with the front cover removed, showing internal wiring and protective devices
Megger multifunction tester displaying a reading during electrical testing
Electrical supply cut-out and incoming cables inside the meter cabinet
Completed consumer unit replacement in Attleborough with labelled circuits and the front cover fitted
Original consumer unit before replacement, with its front cover removed
White double socket on a brick wall in the conservatory
White pendant light fitting above a purple lampshade in the master bedroom
Replacement white double socket on the master bedroom wall
Round ceiling light beside an extractor fan in the bathroom

The Electric11 Electrical Remedial Works Process

This Attleborough consumer unit upgrade followed an unsatisfactory EICR. The project combined a replacement consumer unit with targeted repairs to sockets, lighting fittings and the shed supply, followed by a satisfactory EICR outcome.

Review the EICR Findings

The earlier EICR identified issues requiring attention. The recorded work covered the consumer unit, bedroom and conservatory sockets, a bedroom pendant, a bathroom pull cord and the shed supply connection.

Define the Remedial Work

A clear work schedule brings the required repairs together. For this property, the scope included replacing the main board and specified fittings, installing an IP-rated fused spur and clipping the shed supply cable along the fence.

Complete the Installation

Our team installed the replacement consumer unit and completed the scheduled socket and lighting-related repairs. The external work included the shed’s fused connection and cable route. The finished consumer unit also has clear circuit labels.

Confirm the EICR Outcome

Following completion of the remedial works, the job notes record a satisfactory EICR result. This provides the documented outcome for the project, alongside photographs showing the consumer unit replacement and several completed fittings.

Frequently asked
questions

Can’t find what you’re looking for?
Get in touch with any questions.

The project included a replacement consumer unit, two socket replacements, a bedroom pendant fitting and a bathroom pull cord. We also installed an IP-rated fused spur for the shed supply and clipped the cable along the fence.

An earlier EICR had returned an unsatisfactory result. The remedial works addressed the issues recorded for the property, including work on the consumer unit and individual electrical fittings.

Yes. The supplied job notes record a satisfactory EICR outcome following completion of the remedial works.

The work needed depends on the findings in your report and the condition of your installation. This project included a consumer unit replacement, but your property may need a different scope. Our team can review your report and explain the proposed repairs.

Yes. Where these tasks form part of the agreed scope, we can include them in the same project. In this case, the work covered sockets in the bedroom and conservatory, a bedroom pendant and a bathroom pull cord.

Contact Electric11 to discuss your property and share your existing EICR, if available. We can review the findings, explain the work required and provide a quote.