Electric11 completed EICR remedial works in Norwich after an electrical safety inspection identified C1 and C2 observations at the property. The project focused on rectifying the higher-priority defects recorded in the original Electrical Installation Condition Report and preparing the affected parts of the installation for follow-up testing.

The remedial visit was report-led, allowing our electrician to concentrate on the documented safety concerns rather than carry out unrelated upgrades. Areas photographed during the work included the fire alarm supply and isolator, distribution-board labelling and other fixed electrical accessories.

Project Overview

DetailSpecification
LocationNorwich
Project typeEICR remedial works
Original observationsC1 and C2
Main objectiveRectify the safety defects listed in the EICR
Materials recordedScrews, Wago-style connectors, silicone and short cable lengths
Certification statusFollow-up EICR certificate listed for issue after completion

Addressing C1 and C2 EICR Observations

An EICR assesses the condition of a property’s fixed electrical installation and records defects using recognised classification codes. A C1 observation means danger is present and immediate action is required. A C2 observation identifies a potentially dangerous condition that requires urgent remedial work.

The earlier inspection at this Norwich property recorded items within both categories. Electric11 used the original report as the scope for the remedial visit, working through the affected locations and correcting the safety concerns identified by the inspector.

Property owners who need fixed-wire testing or help understanding an existing report can learn more about obtaining an EICR certificate in Norwich.

Targeted Electrical Remedial Work

The project photographs document a fire alarm supply and isolating switch, distribution-board labelling showing that damaged fire alarm equipment had been disconnected at the spur, and other fixed accessories associated with the inspection. These visual records helped identify the areas requiring attention and supported the report-led repair process.

The work remained focused on the C1 and C2 observations listed in the EICR. No broader refurbishment, full rewire or unrelated electrical improvement was included in the supplied job record.

Where a defect is not immediately visible, professional electrical fault finding can help trace the affected circuit, connection or accessory before the correct repair is completed.

Minor Materials Used for the Repairs

The remedial work used small quantities of electrical and general consumable materials rather than major replacement equipment. The recorded materials included:

  • Screws and fixings

  • Wago-style electrical connectors

  • Silicone or sealant

  • Short lengths of cable

Using targeted materials allowed the electrician to address the report observations while retaining serviceable parts of the existing installation.

Follow-Up Testing and Certification

After remedial work, the affected circuits and accessories require verification to confirm that the recorded defects have been addressed. The supplied job notes state that a follow-up EICR certificate was to be issued once the necessary work had been completed.

The final report outcome should be checked against the completed testing documentation before this case study is published as a satisfactory EICR. This prevents the page from making a certification claim before the signed report is available.

The Result of the Remedial Visit

The targeted repairs addressed the C1 and C2 items within the recorded scope, reducing the electrical risks associated with those observations. The property was then prepared for the required follow-up testing and updated documentation.

This report-led approach kept the work focused and limited disruption while moving the fixed electrical installation towards a satisfactory recorded condition.

Arrange EICR Remedial Works in Norwich

Electric11 provides inspection, fault diagnosis and remedial electrical work for property owners, landlords and businesses throughout Norwich. Our electricians in Norwich can review an unsatisfactory report, explain the observations and provide a clear quotation for the required repairs.

For business premises and managed buildings, our commercial electricians in Norwich can also assist with fixed-wiring concerns, planned maintenance and safety-related electrical work.

If your report contains C1, C2 or FI observations, contact Electric11 to arrange the next steps.

Request an EICR Remedial Quote
Fire alarm circuit labelled as isolated at a distribution board during EICR remedial works in Norwich
Wall-mounted extractor fan and local switch inspected during EICR remedial works in Norwich
Surface-mounted electrical junction box inspected during remedial electrical work in Norwich
Internal wiring of a fire alarm isolator inspected during EICR remedial works in Norwich
Damaged fire alarm isolator opened for inspection during EICR remedial work in Norwich

The Electric11 EICR Remedial Process

We understand that electrical remedial work can affect access to circuits and parts of a property. Our process keeps the work focused on the report findings, with clear communication and minimal disruption from the initial review through to final testing.

Review the EICR Findings

Our electrician reviews the existing inspection report, classification codes and affected circuits before planning the remedial visit. This establishes the required scope and identifies any safety-critical observations that need priority attention.

Provide a Clear and Competitive Quote

We provide a transparent quotation covering the identified repairs, expected materials and testing requirements. The agreed scope stays tied to the report unless further defects become visible and need to be discussed.

Complete the Required Remedial Work

The electrician repairs or replaces the affected components using materials suited to the existing installation and the observations recorded. Work is completed carefully, with affected areas left clean and accessible for verification.

Retest and Update the Documentation

The repaired circuits and accessories are tested after the work. The resulting documentation records the completed remedial action and confirms the installation status once the final assessment has been completed.