Electric11 installed and tested additional double sockets for a veterinary laboratory in Attleborough. The work gave laboratory equipment and workstations more practical access to power while reducing reliance on extension leads and overcrowded outlets.

Project Overview

  • Client: Stony Lane Laboratories Ltd
  • Site: Crowshall Veterinary Services, Attleborough
  • Project type: Laboratory socket installation
  • Equipment installed: Additional double sockets
  • Installation method: Surface-mounted or installed using trunking
  • Circuit: Circuit 1
  • Distribution board: DB2, rear laboratory
  • Testing standard: BS 7671:2018, including amendments current to 2024

The Challenge

Laboratories rely on specialist equipment that must be positioned where procedures can be carried out efficiently. The existing socket arrangement did not provide sufficiently convenient power access across the workbenches.

Additional outlets were therefore required to support the laboratory’s equipment and reduce the need to run flexible leads across working areas. The installation also needed to accommodate existing benches, equipment and wall finishes without creating unnecessary disruption.

Our Solution

Following an assessment of the room and its equipment, Electric11 planned suitable positions for a series of additional double sockets.

The outlets were installed on the surface or within trunking, depending on the requirements of each location. This approach allowed the new wiring to be routed neatly while preserving access for inspection and future maintenance.

The new sockets were connected to Circuit 1 within DB2, located in the rear laboratory. Our wider commercial electrical services follow the same considered approach, with installations planned around the operational needs of each business.

As an experienced electrician in Attleborough, Electric11 was able to complete the work with the laboratory environment and its day-to-day activities in mind.

Testing and Compliance

After installation, the circuit and new accessories were inspected and tested in accordance with BS 7671:2018, including amendments current to 2024.

Recorded results included:

  • Insulation resistance: 999 MΩ
  • Maximum earth fault loop impedance (Zs): 0.55 Ω

The results were documented as part of the electrical verification process. Electric11 also provides professional electrical testing and fault finding for commercial and domestic premises.

The Result

The completed installation provides more convenient power points around the laboratory workbenches. Equipment can now be positioned and connected more practically, helping the laboratory maintain a tidier and more functional working environment.

The project demonstrates how a carefully planned socket installation can improve the everyday usability of a specialist commercial workspace without requiring extensive alterations.

Need Additional Sockets for your Premises?

Electric11 installs additional sockets and electrical circuits for laboratories, workshops, offices and other commercial premises. Contact Electric11 to arrange an assessment and quotation.

Request a Site Visit
Laboratory freezer area with accessible wall-mounted power sockets
Completed laboratory workbench with double sockets above and below the counter
Power and data cables routed beneath the laboratory workbench
FuseBox consumer unit containing the tested laboratory socket circuit
Double electrical socket installed above a clean laboratory worktop
New wall socket supplying a veterinary laboratory workstation
Surface-mounted double socket installed above a laboratory workbench
New double sockets installed above and below a laboratory workbench
Veterinary laboratory bench and equipment before additional socket installation
Laboratory workstation and plate reader assessed for additional power points
Laboratory bench with new sockets serving testing equipment and pipettes
New double sockets installed above and below a laboratory workbench

The Electric11 Laboratory Socket Installation Process

Site and equipment assessment

We assess the room layout, existing electrical installation and the equipment requiring power. This helps us identify suitable socket positions and practical cable routes.

Socket layout and installation planning

Socket locations and installation methods are selected around the workbenches and operational requirements. Surface mounting or trunking may be used where it provides a practical and maintainable solution.

Installation and circuit connection

The sockets and associated wiring are installed and connected to the appropriate distribution board circuit. Work is coordinated to minimise disruption to the premises.

Testing and handover

The completed circuit is inspected and tested. Relevant results are recorded before the installation is handed back for use.

Frequently asked
questions

Can’t find what you’re looking for?
Get in touch with any questions.


Electric11 installed a series of additional double sockets around the laboratory workbenches, providing more practical power access for specialist equipment.

The sockets were surface-mounted or installed using trunking, depending on the position and the most appropriate cable route.

The sockets were connected to Circuit 1 in distribution board DB2, located in the rear laboratory.

Yes. The work was tested in accordance with BS 7671:2018, including amendments current to 2024. Recorded results included insulation resistance of 999 MΩ and a maximum Zs of 0.55 Ω.