Electric11 completed a Mira electric shower installation in Norwich, replacing an existing unit with a Mira Advance 8.7kW thermostatic electric shower. The work included removing the older shower, connecting the replacement to the dedicated circuit, completing electrical testing and issuing certification.
The new unit provides the property with a fully operational thermostatic shower while retaining the existing electrical supply arrangement. Recorded test results confirmed that the circuit and protective devices were satisfactory at the time of completion.
Project Overview
This project required a direct replacement for an existing electric shower. Electric showers combine water and a high-powered electrical supply within a bathroom environment, so the circuit, residual-current protection and final connections all needed to be checked carefully.
Electric11 installed the new 8.7kW unit and tested the affected circuit before returning the shower to service.
| Project Detail | Specification |
|---|
| Location | Norwich, Norfolk |
| Property area | Bathroom |
| Existing equipment | Older electric shower |
| New equipment | Mira Advance thermostatic electric shower |
| Installation size | 8.7kW |
| Circuit reference | DB1, Circuit 2 |
| Circuit protection | 32A Type B protective device |
| Residual-current protection | 30mA |
| Certification | Minor Electrical Installation Works certificate |
Combining Solar Generation and Battery Storage
The installation was designed as a complete home-energy system rather than a standalone solar array. Electricity generated by the panels can be used within the property, stored in the FOX batteries, or exported when generation exceeds household demand and the batteries have sufficient charge.
Battery storage allows more solar electricity to be retained for use later in the day. This can reduce the amount of electricity imported from the grid during periods when solar output is lower.
The Installation Brief
The property required the existing electric shower to be removed and replaced with a new thermostatic model. The confirmed scope included:
- Isolating and removing the existing shower
- Installing one Mira Advance 8.7kW thermostatic electric shower
- Connecting the new unit to the existing dedicated shower circuit
- Checking the circuit protection and residual-current protection
- Testing the completed electrical work
- Issuing a Minor Electrical Installation Works certificate
Removing the Existing Electric Shower
The first stage involved safely isolating the shower circuit and removing the older unit from the tiled bathroom wall. The electrical supply and water connection had to remain controlled throughout the work because both services terminate inside the shower casing.
After removing the cover and disconnecting the old shower, our electrician inspected the available connection points and prepared the area for the replacement unit. This allowed the new installation to use the established shower position without unnecessary changes to the surrounding bathroom.
Installing the Mira Advance 8.7kW Shower
Electric11 fitted a Mira Advance 8.7kW thermostatic electric shower in place of the previous unit. The shower was mounted securely and connected to the existing water and electrical supplies.
The thermostatic design regulates the selected shower temperature during use. Correct installation remains essential because the unit draws a substantial electrical load while operating in a wet environment.
The completed electric shower installation in Norwich provided a practical replacement while retaining the property’s dedicated shower circuit.